When you need office & tenant build-outs
- New lease
- Office layout change
- Retail fit-out
- Adding equipment
- Lighting upgrades
Planning
Coordinate layout with landlords and contractors.
Lighting controls
Energy codes require controls.
Furniture feeds
Power to workstations is planned.
What the electrical scope of a build-out covers
A tenant build-out turns an empty shell or a previous tenant’s layout into a working space. On the electrical side that usually means new branch circuits for workstations, break rooms and copiers; relocating or adding a panelboard; new lighting with occupancy and daylight controls; exit and emergency lighting; and empty conduit or cable trays for data, security and audio-visual systems installed by low-voltage trades.
Reusing existing circuits is sometimes possible, but abandoned wiring from earlier tenants is common above ceilings and has to be removed or properly terminated so inspectors and future electricians are not misled.
Energy codes and lighting controls
Most states adopt a version of the IECC or ASHRAE 90.1, which limits lighting power per square foot and requires controls such as occupancy sensors in private offices and conference rooms, automatic shutoff after hours, and daylight dimming near windows. Inspectors check these controls, so they are designed into the plan rather than added at the end.
Working inside an occupied building
Build-outs often happen while neighboring tenants stay open. Shutdowns of shared panels, fire-alarm tie-ins and core drilling through floors are scheduled with building management, frequently at night or on weekends. Landlords commonly require a certificate of insurance and may have approved-contractor lists for fire-alarm and life-safety work.
Who handles permits and drawings
Electrical drawings are usually part of the permit set submitted by the architect or design-build contractor. The licensed electrical contractor pulls the electrical permit, coordinates rough-in and above-ceiling inspections before tiles go up, and schedules the final inspection that the certificate of occupancy depends on.
How the work is done
- Plan
- Permits
- Rough-in
- Finish
- Inspection
What affects the price of office & tenant build-outs
- Space size
- Lighting
- Data
- Controls
- Schedule
Office & Tenant Build-Outs questions
Who pays for build-outs?
Depends on the lease.
Do build-outs need permits?
Yes.
How long do they take?
Depends on scope.
Can existing wiring be reused?
Sometimes.
Can furniture systems be powered from the floor?
Yes. Floor boxes or poke-through devices feed workstations in open areas, and modular furniture often has its own power harness that the electrician connects to dedicated circuits.