Skip to content
All 50 states + Washington, DC

Commercial Electrical Services

Commercial Panel Upgrades

Commercial panel upgrades replace or expand distribution panels and switchgear to add capacity, three-phase service, or safer equipment for growing businesses.

  • Free to call
  • Independent licensed electricians
  • All 50 states + DC
Commercial Panel Upgrades illustration

When you need commercial panel upgrades

  • Adding equipment
  • Breakers trip often
  • Old or obsolete panels
  • New tenants
  • EV chargers or HVAC upgrades

Load studies

A load study measures demand to determine capacity before upgrades.

Shutdown planning

Upgrades are scheduled to minimize downtime, often after hours.

Utility coordination

Service changes need utility approval and scheduling.

Reading the warning signs in commercial gear

Panels that run warm, breakers that trip during peak hours, a lack of spare breaker spaces, and equipment that is no longer made or supported are the usual triggers. Infrared scans during normal operation often find loose lugs and overloaded breakers before they fail, which is why insurers and facility managers schedule them.

Load studies before buying equipment

The NEC allows existing load to be determined from a year of utility demand data, or from a 30-day recorded load study. That measured demand, plus the new equipment, shows whether the existing service can carry the addition or whether a larger service and switchgear are needed. Guessing from nameplates alone often oversizes the upgrade.

Three-phase basics for business owners

Most commercial buildings use three-phase power, commonly 208Y/120 volts in smaller buildings and 480Y/277 volts in larger ones. Three-phase motors run more efficiently, and loads can be balanced across phases. Adding equipment designed for a different voltage may require a transformer.

Minimizing downtime

Replacing a panelboard or switchgear means a shutdown. Contractors plan these with temporary power, phased cutovers, or after-hours work. Long lead times for switchgear can affect schedules, so equipment is ordered early in the project.

How the work is done

  1. Load study
  2. Design
  3. Permits
  4. Installation
  5. Inspection

What affects the price of commercial panel upgrades

  • Service size
  • Three-phase
  • Switchgear
  • Utility work
  • After-hours labor

Commercial Panel Upgrades questions

How long does a commercial panel upgrade take?

Depends on scope and utility scheduling.

Can work be done after hours?

Often, to reduce disruption.

Do I need drawings?

Larger projects usually require them.

What is three-phase power?

A system used by commercial equipment for efficient power delivery.

Do panel upgrades need utility involvement?

Service size or voltage changes need utility approval and often new metering. Replacing a downstream panelboard usually does not.

Related work

Part of Commercial Electrical Services. Also see: Parking Lot Lighting, Office & Tenant Build-Outs, Restaurant Electrical.

Free to call · All 50 states + DC

Talk to a licensed electrician

Describe the problem and get connected with an independent licensed electrician who serves your area.

Call (855) 679-2483

By calling, you agree to be connected with an independent electrician, who may call or text you back about your request at the number you call from. Calls may be recorded for quality and routing. Consent is not a condition of any purchase, and you can opt out at any time; message and data rates may apply. Privacy policy.

Call (855) 679-2483

Free referral to independent electricians. By calling you consent to a callback or text and call recording. Details