When you need 200 amp service upgrade
- The home has 60 or 100-amp service
- Adding an EV charger, heat pump, electric range or hot tub
- The main breaker trips under heavy use
- The panel is full and outdated
- An addition or ADU is planned
What changes in a 200-amp upgrade
The service entrance conductors, meter base and main panel are sized for 200 amps, and the grounding electrode system is updated to current code. Overhead services may need a new mast and weatherhead; underground services may need a new lateral, which is often the utility’s work.
Is 200 amps always needed?
Not always. A load calculation may show that a 100-amp service can support an EV charger with load management, or that efficient heat pumps fit within existing capacity. Two hundred amps is common because it leaves room for future electrification.
The utility’s role
The utility disconnects service, may upgrade its transformer or drop, and reconnects after inspection. Utility scheduling often sets the timeline, so the electrician applies to the utility early.
Planning for electrification
Heat pumps, induction cooking, EV chargers and heat pump water heaters add loads. Planning a service upgrade around future needs avoids repeated work.
How the work is done
- Load calculation and utility application
- Permit and scheduling the utility disconnect
- Install meter base, service conductors and panel
- Update grounding and bonding
- Inspection, then utility reconnect
What affects the price of 200 amp service upgrade
- Overhead vs. underground service
- Utility requirements and fees
- Meter base and mast replacement
- Panel location changes
- Grounding and bonding updates
200 Amp Service Upgrade questions
How long is the power off for a service upgrade?
Usually most of a working day, depending on inspection and the utility reconnect timing.
Do I need a 200-amp service for an EV?
Not necessarily. Many homes add an EV charger with a load calculation or load management on smaller services.
Who pays for utility work?
It varies by utility. Some cover their side; others charge for transformer or lateral upgrades. Ask your utility early.
Can I upgrade to 400 amps?
Large homes with high electric loads sometimes use 320 or 400-amp services, often with two 200-amp panels. A load calculation and utility approval decide.
Related work
Part of Electrical Panel Upgrade. Also see: Subpanel Installation, Meter Base Replacement, Breaker Replacement, Fuse Box Replacement.